Passwords are now required to access your library account. To create a password, select "Reset my Password" from the Login screen (email address required). For further assistance, please contact the library. / Ahora se requieren contraseñas para acceder a su cuenta de la biblioteca. Para crear una contraseña, seleccione "Restablecer mi contraseña" en la pantalla de inicio de sesión (se requiere dirección de correo electrónico). Para obtener más ayuda, comuníquese con la biblioteca.


Showing 81 - 100 of 433 , query time: 0.01s
Cover Image
Format:
Image
Placing concrete in spiral stairway and air shaft from elevation 7641 to 7649.5.
Cover Image
Format:
Image
Placing reinforcement in spiral stairway and air shaft.
Cover Image
Format:
Image
Dome of gate chamber and base of stair shaft after forms were stripped.
Cover Image
Format:
Image
Looking downstream in spillway channel from sta. 14+25. Excavation in foreground is too subgrade. Water appears to have been trapped by rock ridge seen in Pine R - 149.
Cover Image
Format:
Image
Looking upstream at excavation for spillway stilling basin. Taken from right side of spillway at sta. 30+50.
Cover Image
Format:
Image
Looking upstream at excavation for spillway stilling basin. Taken from right side of spillway at sta. 30+50.
Cover Image
Format:
Image
Looking upstream in spillway channel excavation. Shovel is working in stilling basin.
Cover Image
Format:
Image
Looking downstream in spillway channel from sta. 7+00. Le Tourneau in foreground is excavating material upstream from sta. 15+00. Placing of concrete walls can be seen below station 15+00.
Cover Image
Format:
Image
Placing dumped riprap on right side of spillway outlet channel. Darker colored rock was placed during 1939 season.
Cover Image
Format:
Image
Panorama looking upstream at spillway and river channels from spillway station 30+50. Placing of drains and fine grading for concrete on vertical curve and stilling basin floor can be seen at left.
Cover Image
Format:
Image
Looking upstream at spillway stilling basin from right side of channel at station 30+50. Backfill behind stilling basin walls has been completed. Refer to Pine R - 306
Cover Image
Format:
Image
Looking downstream at spillway stilling basin from left side of channel at sta. 26+30. Placing section of stilling basin wall in foreground. Refer to Pine R - 283.
Cover Image
Format:
Image
Panorama looking upstream at spillway and river channels from spillway station 30+50. Placing of drains and fine grading for concrete on vertical curve and stilling basin floor can be seen at left.
Cover Image
Format:
Image
Looking upstream at spillway from a point approximately 300 ft. downstream from end of structure. Discharge is estimated at 120-second feet.
Cover Image
Format:
Image
Looking upstream in outlet conduit from point opposite sta. 13+40 of the outlet conduit. Dragline is placing concrete in invert with a bottom-dump bucket.
Cover Image
Format:
Image
Placing concrete in outlet conduit between stations 10+64.17 and 10+96.83. Dump trucks haul concrete from the mixing plant and dump into the hopper which is lowered to the buggy deck with a small dragline.
Cover Image
Format:
Image
Looking upstream in outlet conduit from a point on the right rim near the intersection with the cut-off trench.
Cover Image
Format:
Image
Looking downstream in outlet channel from sta. 14+50, showing construction of drainage system under the channel floor. Spillway cut is seen in background.
Cover Image
Format:
Image
Looking upstream in outlet channel from station 15+50 of spillway. Intersection of outlet channel and spillway in immediate foreground. Refer to Pine R - 166
Cover Image
Format:
Image
Caterpillar RD-8 bulldozer bogged down in excavation for the outlet works at station 13+40.