Library hours: Mon-Thurs 9-7; Fri 9-6; Sat 9-5; Sun 12-5. Get more info at our website www.telluridelibrary.org.   

Horario de biblioteca: Lun-Jue 9-7; Vie 9-6; Sáb 9-5; Dom 12-5. Para más información, visite www.telluridelibrary.org

Passwords are now required to access your library account. To create a password, select "Reset my Password" from the Login screen (email address required). For further assistance, please contact the library. / Ahora se requieren contraseñas para acceder a su cuenta de la biblioteca. Para crear una contraseña, seleccione "Restablecer mi contraseña" en la pantalla de inicio de sesión (se requiere dirección de correo electrónico). Para obtener más ayuda, comuníquese con la biblioteca.


Showing 41 - 60 of 432 , query time: 0.01s
Cover Image
Format:
Image
Close-up of sand deposit in cut-off trench on right bank of the river channel.
Cover Image
Format:
Image
Looking upstream at dam toward right abutment from a point about 500 feet downstream from axis at sta. 22+00. Note transition in slopes of cobble fill. Temporary diversion channel was in foreground and has been refilled.
Cover Image
Format:
Image
Using dragline to trim slopes of cobble fill on downstream face of embankment.
Cover Image
Format:
Image
View of dam looking downstream from a point on left side of reservoir, approximately 1/4 mile upstream.
Cover Image
Format:
Image
Panorama of dam looking downstream from a point on right side of reservoir about 1200 feet upstream from axis. (Photographic point No. 5). Downstream end of Borrow Pit No. 1 in foreground.
Cover Image
Format:
Image
Panorama of dam looking downstream from point on right side of reservoir, about 1200 feet upstream from axis - Photographic point No. 5 - Elevation of fill 7663.5.
Cover Image
Format:
Image
View of dam looking downstream from a point on left side of reservoir, approximately 1/4 mile upstream.
Cover Image
Format:
Image
View of dam looking upstream from a point approximately 3/4 mile away.
Cover Image
Format:
Image
Looking along axis toward left abutment from centerline of spillway. (Photographic point No. 1). Note portion of cut-off wall covered with canvas in foreground, and panel forms being set for another portion.
Cover Image
Format:
Image
Looking along axis toward left abutment from centerline of spillway. (Photographic point No. 1). Refilling of cut-off trench in foreground is nearly complete.
Cover Image
Format:
Image
Looking along axis toward left abutment from centerline of spillway. (Photographic point No. 1).
Cover Image
Format:
Image
Looking along axis toward left abutment from centerline of spillway. Excavation for cut-off trench is practically complete.
Cover Image
Format:
Image
Looking along axis toward left abutment from centerline of spillway. (Photographic point No. 1).
Cover Image
Format:
Image
Panorama of dam looking upstream from a point on the right abutment about 1/4 mile downstream from axis. (Photographic point No. 2). Refer to Pine R - 248 a&b (D003009).
Cover Image
Format:
Image
Panorama of the dam looking upstream from a point on right abutment about 1/4 mile downstream from axis. (Photographic point No. 2). Refer to Pine R - 196 a&b (D003008).
Cover Image
Format:
Image
Mosaic of dam looking upstream from a point on the right abutment about 1/4 mile downstream from axis. (Photographic point No. 2). Refer to Pine R - 248 a&b (D003009) and Pine R - 322 a&b (D003010).
Cover Image
Format:
Image
View of dam looking downstream from a point on left side of reservoir, approximately 1/4 mile upstream.
Cover Image
Format:
Image
View of dam looking downstream from a point on left side of reservoir, approximately 1/4 mile upstream.
Cover Image
Format:
Image
View of dam looking downstream from a point on left side of reservoir, approximately 1/4 mile upstream.
Cover Image
Format:
Image
Looking along axis toward left abutment from centerline of spillway. (Photographic point No. 1). Spiral stariway shaft is seen in foreground. Outlet conduit is completely covered.