Passwords are now required to access your library account. To create a password, select "Reset my Password" from the Login screen (email address required). For further assistance, please contact the library. / Ahora se requieren contraseñas para acceder a su cuenta de la biblioteca. Para crear una contraseña, seleccione "Restablecer mi contraseña" en la pantalla de inicio de sesión (se requiere dirección de correo electrónico). Para obtener más ayuda, comuníquese con la biblioteca.


Showing 421 - 432 of 432 , query time: 0.04s
Cover Image
Format:
Image
Looking toward left abutment from axis sta. 20+00. Le Tourneaus are starting excavation for the additional cut-off trench in the foreground.
Cover Image
Format:
Image
Foundation drainage system. Note grout risers at right side of trench for grouting system after embankment has been placed.
Cover Image
Format:
Image
Looking upstream at sump for foundation system from station 8+00.
Cover Image
Format:
Image
Excavation of additional cut-off trench looking toward right abutment from axis sta. 16+50. Right side of cut is in primary cut-off trench placed in 1938. Shovel is working in original foundation material. Refer to Pine R - 182.
Cover Image
Format:
Image
Excavation for additional cut-off trench, looking toward right abutment from axis station 16+75. Excavation is complete and bottom of trench is a minimum of 6 ft. into glacial till. Refer to Pine R - 188.
Cover Image
Format:
Image
Placing embankment in additional cut-off trench. Looking toward right abutment from axis station 15+75.
Cover Image
Format:
Image
End of completed additional cut-off trench at axis station 19+50, taken from station 18+25. Refer to Pine R - 190.
Cover Image
Format:
Image
Downstream side of additional cut-off trench showing sand pocket. Taken from axis at station 15+75.
Cover Image
Format:
Image
Excavation for additional cut-off trench, looking toward left abutment from axis sta. 14+90. Excavation is practically complete. Junction with secondary cut-off is at rear end of shovel. Refer to Pine R - 183.
Cover Image
Format:
Image
Looking downstream in inlet channel to outlet works from outlet works station 4+50, note 3 to 1 slope directly behind trashrack which will be riprapped.
Cover Image
Format:
Image
Looking downstream in outlet conduit from sta. 6+75. showing placing of compacted embankment over conduit. Refer to Pine R - 134.
Cover Image
Format:
Image
Placing forms and reinforcement for gate chamber and addition to spiral stairway shaft.