Library hours: Mon-Thurs 9-7; Fri 9-6; Sat 9-5; Sun 12-5. Get more info at our website www.telluridelibrary.org.   

Horario de biblioteca: Lun-Jue 9-7; Vie 9-6; Sáb 9-5; Dom 12-5. Para más información, visite www.telluridelibrary.org

Passwords are now required to access your library account. To create a password, select "Reset my Password" from the Login screen (email address required). For further assistance, please contact the library. / Ahora se requieren contraseñas para acceder a su cuenta de la biblioteca. Para crear una contraseña, seleccione "Restablecer mi contraseña" en la pantalla de inicio de sesión (se requiere dirección de correo electrónico). Para obtener más ayuda, comuníquese con la biblioteca.


Showing 1 - 10 of 10 , query time: 0.01s
Cover Image
Format:
Image
The D.&R.G. work train at Kent. From left, Dever and Rodgers.
Cover Image
Format:
Image
Two men sitting on either side of a crew car at Kent.
Cover Image
Format:
Image
Bridge construction crew.
Cover Image
Format:
Image
Workers constructing track and a platform at Kent.
Cover Image
Format:
Image
Tom Gill, an unidentified man, and Hughie constructing movable scaffolding. The scaffolding is on train wheels and is pulled by a horse or mule when working on tunnel interiors, e.g. the railway tunnel under Tennessee Pass.
Cover Image
Format:
Image
The D.&R.G. work train at Kent.
Cover Image
Format:
Image
Cover Image
Format:
Image
Crew working on the railroad ties at Kent. Inscription reads: "Joint ahead!"
Cover Image
Format:
Image
Workers constructing track at Kent.
Cover Image
Format:
Image
The work train crew posing on the tracks at Kent, 1918. "Often a work train of the 1880s consisted of just the machine and the locomotive, as cabooses were still too scarce to warrant using one on what many managers saw as unnecessary service. As the years went by, it became common practice to attach a caboose, and/or a tool car, to the train. An extra water car was frequently attached to pile driver trains to reduce the number of times the train...