Library hours: Mon-Thurs 9-7; Fri 9-6; Sat 9-5; Sun 12-5. Get more info at our website www.telluridelibrary.org.   

Horario de biblioteca: Lun-Jue 9-7; Vie 9-6; Sáb 9-5; Dom 12-5. Para más información, visite www.telluridelibrary.org

Passwords are now required to access your library account. To create a password, select "Reset my Password" from the Login screen (email address required). For further assistance, please contact the library. / Ahora se requieren contraseñas para acceder a su cuenta de la biblioteca. Para crear una contraseña, seleccione "Restablecer mi contraseña" en la pantalla de inicio de sesión (se requiere dirección de correo electrónico). Para obtener más ayuda, comuníquese con la biblioteca.


Showing 1 - 3 of 3 , query time: 0.01s
Cover Image
Format:
Image
Belden as seen from Gilman. On the left are the loading tippel, steam room and dryer. Loading tippel is extended over the railroad cars to be filled with ore. A surface tram carrying ore ready for loading is visible behind the loading tippel.
Cover Image
Format:
Image
Belden as seen from Gilman. On the left are the loading tippel, steam room and dryer. Loading tippel is extended over the railroad cars to be filled with ore. A surface tram carrying ore ready for loading is visible behind the loading tippel.
Cover Image
Format:
Image
Dick Sayers (l) and John Skinner (r) at the pumping station on 20 level at Gilman. "Water for the mine came directly from the Eagle River from the pump house, which was just across the ramp coming down the mill incline. About 50 tons of ore per hour went through the mill during each eight-hour shift." Eagle River Valley, p.38