Library hours: Mon-Thurs 9-7; Fri 9-6; Sat 9-5; Sun 12-5. Get more info at our website www.telluridelibrary.org.   

Horario de biblioteca: Lun-Jue 9-7; Vie 9-6; Sáb 9-5; Dom 12-5. Para más información, visite www.telluridelibrary.org

Archive Search Results


Showing 61 - 80 of 432 , query time: 0.01s
Thumbnail for 'View of left abutment from center of spillway (11)'
Format:
Image
Looking along axis toward left abutment from centerline of spillway. (Photographic point No. 1).
Thumbnail for 'View of left abutment from center of spillway (10)'
Format:
Image
Looking along axis toward left abutment from centerline of spillway. (Photographic point No. 1).
Thumbnail for 'Panorama of damsite looking upstream (3)'
Format:
Image
Panorama of damsite looking upstream from a point on right abutment about 1/4 mile downstream from dam. (Photographic point No. 2). Refer to Pine R - 112 a&b (D003007).
Thumbnail for 'Panorama of damsite looking upstream (2)'
Format:
Image
Panorama of damsite looking upstream from a point on right abutment about 1/4 mile downstream from dam. (Photographic point No. 2). See Pine R - 25 a&b (D003006).
Thumbnail for 'General view of contractor's camp'
Format:
Image
General view of camp constructed by the Martin Wunderlich Co. The three large buildings at the left are the commissary, mess hall and office.
Thumbnail for 'Panorama of damsite looking upstream (1)'
Format:
Image
Panorama of damsite looking upstream from point on right about 1/4 mile downstream from dam.
Thumbnail for 'View of portion of government camp (2)'
Format:
Image
View of portion of government camp. Two-room temporary residences.
Thumbnail for 'View of portion of contractor's camp'
Format:
Image
View of 2-room duplex residences built by Martin Wunderlich Co.
Thumbnail for 'View of government and contractor camps'
Format:
Image
View of government camp and contractor's camp from mountain on South side of valley. Contractor's camp to the left, government camp in center, and Vallecito Dam at extreme right. Note temporary diversion channel and log crib drop in lower right hand corner.
Thumbnail for 'View of left abutment from center of spillway (3)'
Format:
Image
Looking along axis toward left abutment from centerline of spillway. (Photographic point No. 1). Excavation in foreground is for cut-off trench at right abutment.
Thumbnail for 'View of left abutment from center of spillway (4)'
Format:
Image
Looking along axis toward left abutment from centerline of spillway. (Photographic point No. 1). Cross-cut in foreground is excavation for the outlet conduit.
Thumbnail for 'View of portion of government camp (1)'
Format:
Image
View of portion of government camp. Beginning at right side buildings are: permanent residence, office, and four temporary residences.
Thumbnail for 'View of left abutment from center of spillway (1)'
Format:
Image
Damsite after stripping - Looking along axis of dam toward left abutment from centerline of spillway. (Photographic point No. 1). Double line of stakes seen in foreground are slope stakes for outlet conduit excavation.
Thumbnail for 'View of dam looking downstream (7)'
Format:
Image
View of dam looking downstream from a point on left side of reservoir, approximately 1/4 mile upstream.
Thumbnail for 'View of left abutment from center of spillway (2)'
Format:
Image
Looking along axis toward left abutment from centerline of spillway. (Photographic point No. 1). Excavation in foreground is for cut-off trench at right abutment. Large stakes define different sections of the embankment.
Thumbnail for 'View of dam looking downstream (6)'
Format:
Image
View of dam looking downstream from a point on left side of reservoir, approximately 1/4 mile upstream.
Thumbnail for 'Hand-tamping around outlet conduit'
Format:
Image
View of hand-tamping operations around outlet conduit, taken fro the top of the left bank opposite outlet works station 8+85. Note embankment cut-off wall in left background.
Thumbnail for 'Close-up of hand-tamping operations'
Format:
Image
Close-up of hand-tamping operations in backfilling along the outlet conduit from works station 9+25.
Thumbnail for 'Reinforcing outlet conduit with steel'
Format:
Image
Placing reinforcement steel in section of outlet conduit.
Thumbnail for 'Placing concrete in spiral stairway and air shafts'
Format:
Image
Placing concrete in spiral stairway and air shaft from elevation 7641 to 7649.5.