Library hours: Mon-Thurs 9-7; Fri 9-6; Sat 9-5; Sun 12-5. Get more info at our website www.telluridelibrary.org.   

Horario de biblioteca: Lun-Jue 9-7; Vie 9-6; Sáb 9-5; Dom 12-5. Para más información, visite www.telluridelibrary.org

Archive Search Results


Showing 21 - 28 of 28 , query time: 0.01s
Thumbnail for 'Zinc enters dryer'
Format:
Image
Entrance point of the zinc concentrate into the dryer.
Thumbnail for 'Belden as seen from Gilman'
Format:
Image
Belden as seen from Gilman. On the left are the loading tippel, steam room and dryer. Loading tippel is extended over the railroad cars to be filled with ore. A surface tram carrying ore ready for loading is visible behind the loading tippel.
Thumbnail for 'New dryer placement'
Format:
Image
New dryer being put in place at Belden. Drying fins are seen in the inside of the dryer.
Thumbnail for 'Zinc dryer from railroad car to dryer building'
Format:
Image
Moving the zinc dryer from a railroad car into the dryer building at Belden. A wall section approximately 60 feet long has been removed in the dryer building to move this equipment into the facility.
Thumbnail for 'Moving a dryer section'
Format:
Image
Moving a dryer section into place by blocking and chaining. Small sections pf pipe were also used to move the dryer.
Thumbnail for 'Moving the zinc dryer'
Format:
Image
Section of the zinc dryer being fitted into place at Belden. Chains and blocks are used to move the equipment into the building.
Thumbnail for 'Drills and lathes'
Format:
Image
Drills and lathes in the repair area. Welders and machinists were employed by New Jersey Zinc to maintain and recycle equipment. During the 1950s, there were three shifts working each day to maintain production levels.
Thumbnail for 'Unloading zinc from dryer'
Format:
Image
Conveyor unloading zinc from the dryer at Belden. The zinc was then taken to the loading tippel to be loaded on railcars. Durbin McIlnay is monitoring the process.