Damsite after stripping - Looking along axis of dam toward left abutment from centerline of spillway. (Photographic point No. 1). Double line of stakes seen in foreground are slope stakes for outlet conduit excavation.
Looking along axis toward left abutment from centerline of spillway. (Photographic point No. 1). Excavation in foreground is for cut-off trench at right abutment. Large stakes define different sections of the embankment.
View of hand-tamping operations around outlet conduit, taken fro the top of the left bank opposite outlet works station 8+85. Note embankment cut-off wall in left background.
Looking downstream in spillway channel from sta. 14+25. Excavation in foreground is too subgrade. Water appears to have been trapped by rock ridge seen in Pine R - 149.
Looking downstream in spillway channel from sta. 7+00. Le Tourneau in foreground is excavating material upstream from sta. 15+00. Placing of concrete walls can be seen below station 15+00.
Panorama looking upstream at spillway and river channels from spillway station 30+50. Placing of drains and fine grading for concrete on vertical curve and stilling basin floor can be seen at left.
Looking upstream at spillway stilling basin from right side of channel at station 30+50. Backfill behind stilling basin walls has been completed. Refer to Pine R - 306
Looking downstream at spillway stilling basin from left side of channel at sta. 26+30. Placing section of stilling basin wall in foreground. Refer to Pine R - 283.
Panorama looking upstream at spillway and river channels from spillway station 30+50. Placing of drains and fine grading for concrete on vertical curve and stilling basin floor can be seen at left.