Library hours: Mon-Thurs 9-7; Fri 9-6; Sat 9-5; Sun 12-5. Get more info at our website www.telluridelibrary.org.   

Horario de biblioteca: Lun-Jue 9-7; Vie 9-6; Sáb 9-5; Dom 12-5. Para más información, visite www.telluridelibrary.org

Archive Search Results


Showing 421 - 426 of 426 , query time: 0.01s
Thumbnail for 'Completed additional cut-off trench'
Format:
Image
End of completed additional cut-off trench at axis station 19+50, taken from station 18+25. Refer to Pine R - 190.
Thumbnail for 'Downstream side of additional cut-off trench'
Format:
Image
Downstream side of additional cut-off trench showing sand pocket. Taken from axis at station 15+75.
Thumbnail for 'Excavation of additional cut-off trench (5)'
Format:
Image
Excavation for additional cut-off trench, looking toward left abutment from axis sta. 14+90. Excavation is practically complete. Junction with secondary cut-off is at rear end of shovel. Refer to Pine R - 183.
Thumbnail for 'Looking downstream in inlet channel'
Format:
Image
Looking downstream in inlet channel to outlet works from outlet works station 4+50, note 3 to 1 slope directly behind trashrack which will be riprapped.
Thumbnail for 'Looking downstream in outlet conduit (8)'
Format:
Image
Looking downstream in outlet conduit from sta. 6+75. showing placing of compacted embankment over conduit. Refer to Pine R - 134.
Thumbnail for 'Forming and reinforcing gate chamber'
Format:
Image
Placing forms and reinforcement for gate chamber and addition to spiral stairway shaft.