Library hours: Mon-Thurs 9-7; Fri 9-6; Sat 9-5; Sun 12-5. Get more info at our website www.telluridelibrary.org.   

Horario de biblioteca: Lun-Jue 9-7; Vie 9-6; Sáb 9-5; Dom 12-5. Para más información, visite www.telluridelibrary.org

Archive Search Results


Showing 361 - 380 of 433 , query time: 0.01s
Thumbnail for 'Truck dumping riprap on upstream slope'
Format:
Image
Truck dumping riprap on upstream slope of dam near station 23+50.
Thumbnail for 'Looking toward left abutment along upstream face'
Format:
Image
Looking along upstream face of dam toward left abutment from station 24+00. Bulldozer is being used to place riprap after being dumped from trucks. Note small average size of pieces compared with hat in foreground.
Thumbnail for 'Dumped riprap on upstream face'
Format:
Image
Dumped riprap on upstream face of embankment in the vicinity of station 20+00.
Thumbnail for 'Dumping riprap on top of embankment'
Format:
Image
Dumping riprap from bottom dump Euclid near the top of existing embankment.
Thumbnail for 'Bulldozer placing riprap'
Format:
Image
Placing riprap with bulldozer after truck has dumped.
Thumbnail for 'Looking toward right abutment along cut-off trench'
Format:
Image
Looking toward right abutment in cut-off trench from sta. 37+00. Embankment is being placed and hand-compacted on each side of the concrete wall.
Thumbnail for 'View of cut-off trench looking toward right abutment'
Format:
Image
View of cut-off trench looking toward the right abutment of the dam from the upstream rim of the cut-off trench opposite station 33+50. Refer to Pine R - 71
Thumbnail for 'Cut-off trench, looking toward right abutment'
Format:
Image
Cut-off trench, looking toward right abutment from sta. 33+50.
Thumbnail for 'Compacting embankment'
Format:
Image
Compacting embankment adjacent concrete cut-off wall, with air-operated sheet-piling hammers.
Thumbnail for 'Looking toward right abutment in cut-off trench'
Format:
Image
Looking toward right abutment in cut-off trench. Part of footing for concrete wall is seen on slope. Wagon drill is working on 50-foot grout hole. Refer to Pine R - 66.
Thumbnail for 'Survey crew in deepest portion of cut-off trench'
Format:
Image
Cut-off trench excavation looking toward left abutment from a point opposite sta. 27+50. Survey crew is seen working at deepest portion of trench, which was through the sand pocket at station 23+25.
Thumbnail for 'Placing concrete in cut-off wall'
Format:
Image
Placing concrete in cut-off wall opposite station 33+50, looking toward the right abutment. At left center concrete from the pump-crete pipe line is flowing into a hopper from which it is wheeled in buggies to the point of placement.
Thumbnail for 'View of right abutment along centerline'
Format:
Image
Looking toward the right abutment along centerline of the cut-off trench from opposite dam axis sta. 30+50, cut-off wall is completed, and placing of hand-compacted embankment has been started.
Thumbnail for 'View of cut-off trench excavation and left abutment'
Format:
Image
Cut-off trench excavation looking toward left abutment from a point opposite sta. 24+00. The excavation is complete from the transit in foreground to the group standing in bottom of trench.
Thumbnail for 'Cut-off trench awaiting embankment'
Format:
Image
Cut-off trench excavation from sta. 20+00 to the river. A small section of embankment is shown in the immediate foreground. The remainder of the trench is being prepared to receive embankment.
Thumbnail for 'Placing and rolling embankment in cut-off trench'
Format:
Image
Placing and rolling embankment in the cut-off trench. The cut seen at right center normal to the cut-off trench is the excavation for removal of the sand pocket at station 73+25.
Thumbnail for 'View of cut-off trench excavation and right abutment'
Format:
Image
Excavation for cut-off trench from point near station 21+00 looking toward right abutment.
Thumbnail for 'Rock excavation for concrete cut-off wall footing (1)'
Format:
Image
Rock excavation for concrete cut-off wall footing, looking toward left abutment from opposite station 3+75.
Thumbnail for 'View of left abutment along cut-off trench centerline (1)'
Format:
Image
Looking along centerline of cut-off trench toward the left abutment from opposite station 9+00.
Thumbnail for 'Placing concrete for cut-off wall footings at left abutment (1)'
Format:
Image
Placing concrete for cut-off wall footings at left abutment.